Search
Displaying 5471 - 5480 of 5553
Document
2-8-23 Civil Service Board Meeting Agenda
BOARD OF COMMISSIONERS Kari K. Steele President Kimberly Du Buclet Vice President Marcelino Garcia C…
Document
Report No. 23-05 Hanover Park Water Reclamation Plant Fischer Farm Monitoring Report for Fourth Quarter 2022: Special Condition 6
MONITORING AND RESEARCH DEPARTMENT REPORT NO. 23-05 HANOVER PARK WATER RECLAMATION PLANT FISCHER FAR…
Document
Report No. 23-04 Hanover Park Water Reclamation Plant Fischer Farm Monitoring Report for Fourth Quarter 2022: Special Condition 5
MONITORING AND RESEARCH DEPARTMENT REPORT NO. 23-04 HANOVER PARK WATER RECLAMATION PLANT FISCHER FAR…
Document
Climate Action Plan Brochure
CLIMATE ACTION PLAN MAY 4, 2023 The MWRD takes climate action The MWRD prides itself as an environme…
Document
Think Beyond the Banks - Spanish
¡PIENSA! MÁS ALLÁ DE LA ORILLA USTED PUEDE AYUDAR A MEJORAR EL RIÓ DE CHICAGO CON ESTASUSTED PUEDE A…
Document
7-19-23 Civil Service Board Meeting Agenda
Metropolitan Water Reclamation District of Greater Chicago 100 EAST ERIE STREET July 14, 2023 CHICAG…
Document
Little Calumet WPC Meeting Agenda July 2023
Little Calumet River Watershed Planning Council 1904 W. 174th Street East Hazel Crest, IL 60429 (708…
Document
O&M Template - Plant-Based - 2023
[Organization Name], OPERATION & MAINTENANCE PLAN, FOR, [PROJECT NAME], Inspection Schedule, By December 31st of each year following final completion of the Project, the [Organization] must pre…, Bioswale, Rain Garden, and Bioretention O&M Plan, The minimum O&M requirements outlined in this document shall be incorporated into the [Organizat…, Sign-off by Director of Public Works or equivalent:, I attest that I have reviewed this plan and can commit the necessary resources towards implementing…, Inspection Log for Rain Garden/Bioretention Area, · Refer to the “[Organization]’s Operation & Maintenance Plan for [Project Name]” for detailed r…, Inspector:, Date: Time:, Time Since Last Rain Event, Rainfall Depth:, Project #:, Project Name:, Rain Garden/Bioretention Area:, General Site Conditions:, Inspection Items, Satisfactory (S) or Unsatisfactory (U), Comments/Corrective Action, Issue Location, Vegetation, For mulched area: complete coverage of hardwood mulch For seeded or non-mulched area: 90% cover vege…, Surface Infiltration, No accumulation of sediment or debris or signs of sedimentation at inflow areas No water ponding 24…, Drainage Structure and Cleanouts Inspection (if equipped), No evidence of blockage Good condition without need for repair: no sedimentation, blockage, or erosi…, Signage, Educational signage is present and in good condition, Additional Comments, Recommendations:, Page 5 of 11
Document
O&M Template - Permeable Pavement - 2023
[Organization Name], OPERATION & MAINTENANCE PLAN, FOR, [PROJECT NAME], Inspection Schedule, By December 31st of each year following final completion of the Project, the [Organization] must pre…, Permeable Pavement Systems O&M Plan, The minimum Operation & Maintenance (O&M) requirements outlined in this document shall be in…, Sign-off by Director of Public Works or equivalent:, I attest that I have reviewed this plan and can commit the necessary resources towards implementing…, Inspection Log for Permeable Pavements, · Refer to the “[Organization]’s Operation & Maintenance Plan for [Project Name]” for detailed r…, Inspector:, Date: Time:, Time Passed Since Last Rain Event:, Project #:, , Project Name:, , Permeable/Porous Pavement Area:, General Site Conditions:, Inspection Items, Satisfactory (S) or Unsatisfactory (U), Comments/Corrective Action, Issue Location, Surface Infiltration, No sedimentation or signs of sedimentation on permeable pavement and between pavers in joint aggrega…, Pavement Condition, No evidence of deterioration No cuts from utilities visible No evidence of improper load applied (de…, Controlling Run-On, Adjacent vegetated areas show no signs of erosion and run-on to permeable pavement, Salt/Deicing (Early Spring only), No evidence for the use of traction sand Piles of accumulated salt removed in spring, Drainage Structure Inspection (Early Spring/Late Fall/After >1.5 inches of rainfall), No evidence of blockage Good condition, no need for cleaning/repair Observation wells show water has…, Signage, Signage for no stockpiling/seal coating, etc. is present Educational signage is present and in good…, Additional Comments, Recommendations: